
Add to Cart
1590BBS Style Extra Deep Pedal Enclosure 4.73"*3.7"*1.67" Aluminum Boxes 1610NS
Product Description
Used by Famous Guitar Effects Pedal manufacturers in the world;
62pcs in one carton;
LxWxD : 4.73"*3.7"*1.67";
Heavy duty ADC12 Aluminum alloy enclosure;
Including bottom, lid and 4pcs stainless steel screws;
ROHS Compliant;
Finish: oxidized finish for uniform paint and powder coat adhesion;
Drilled service: Cost effective way by punching machine to save 85% of your machined holes.;
Clone Hammond 1590BBS/ Similar EHX 1610NS & Sunvast 1590BBS.
How to use for 1590BBS Diecast Alumium Metal Enclosure Box
These Diecast Enclosure for Music Devices:
Bass Pedals, Chrorus, Phase Shifers,Flanges,Distrotion, Fuzz, Filters,Overdrive, Foot Switches,Foot controllers, Mutti Effect,Noise Gate,Noise Suppresion,Octave,Synthesis,Pitch Preamps,EQs & Tone Shaping, Reverb,Tremo & Vibrato, Tube Pedals,Vocal Processors,Etc.
Information on 1590BBS Diecast Alumium Metal Box
Product Attribute | Attribute Value |
---|---|
Series | 1590BBS Series |
Surface | Particlulates Vibration grinded to Anti- Oxidation |
Material | DieCast Aluminum |
IP Rating | IP54 |
Size1 with Lid | 4.73"*3.7"*1.67" |
Size 2 with Lid | 112mm*61mm*42.4mm |
Size 3 without Lid | 4.73"*3.7"*1.5" |
Size 4 without Lid | 145mm*95mm*38.3mm |
Package | 1 Box+1 Lid+ 4 pieces SS Screws |
Screw Type | 6-32*1/2" |
Manufacturer or Trader | Manufacturer |
Notes | Hammond 1590BBS Clone, Same as EHX 1610 NS, Sunvast 1590BBS |
Siz Range | Not normally over 2.7feet square |
Parts Weight | 0.01pounds to 14 pounds |
Setup Cost | New die casting tooling is free |
Tolerances | 0.02inch,add0.01inch to 0.015inch across parting line up to part size |
Die Casting Finish | 32~63 RMS |
Minium Draft | normally 1° |
Billet | normally 0.04inch |
Normal Minimum Section Thickness | 0.060inch for small parts; |
Ordering Quantity | For first trial order: not less than 100pcs; |
Normal Leadtime | Tooling: 4~12 weeks update part size; |
FAQs
Rugged 1610NS 1590BBS Die Cast Enclosure Made of Easy to Drill Aluminum Alloy 4.73"*3.7"*1.67"
1. Do we need to pay the tooling/mould cost?
For these enclosures(1590A, 1590B,1590BB,1590BBS,1590C,1790,125B,1590J,125B), you didn`t need to pay the tooling/mould cost.
2. Can we custom Cast Aluminum Enclosure?
Custom enclosure is welcome and you should pay this tooling cost.
Die casting Tooling paid by our customer is the property of our customers.
3. How to custom Cast Aluminum Enclosure?
Customers send the IGS/STEP drawings or sample to us for offer;
Will talk about the details to meet castabilities;
After customer`s acceptance on our prices, we will send our 3D molding drawing for approval;
After approving the 3D molding drawing, we will start the production of the tooling/mold after the deposit of mold/tooling cost paid;
After mold/tooling finished, will send the samples for customer`s check;
After samples approved, will prepare the production on trial order after customer`s payment for the balance for the mold/tooling cost.
4. What about your prices?
Our price can satisfy customers who want to get competitvely priced aluminum die casting enclosures & free of defects.
5. What is your Quality?
We had supplied these die cast aluminum enclosures to our customers over ten years in USA. And we clearly learn all requirements on these enclosures.
6. How to do as the defective Die Cast Aluminum Box found?
We will remake these die cast aluminum enclosures to you for free.
7. What is your Trade Terms?
FOB, EXW, CFR, CIF, DDU, DDP are available.
8. What is your payment term?
For orders, if total value less than USD5,000, 100% paid as order confirmed. If more than USD5,000, payment terms can be available.
For tooling/mold cost, 50% as a deposit and the balance paid after samples approved by customer.
9. What are you value-added service?
Cost Effective Drilled service can be available.Equipped many punching machines are to decrease these drilled costs by CNC machining.
10. What is the delivery time?
In one week if we have some stocks;
Three weeks if out of stock without new tooling developing;
Five weeks if new tooling developed;
If you have urgent demands,we can make an exception.
11. Are you a trader?
No, we are a maunfactuer.